B A U K U N S T
HOME OVERVIEW PROJECTS

Commercial & Industrial

COLMA, CA

2101 Hillside
Fence design for new columbarium building at Hoy Sun Memorial Cemetery


DALY CITY, CA

Fil - Am Cultural Center
1420 Southgate Conceptual design.

Children's Playhouse Daycare, 58 Hill
T.I. and occupancy change. Exterior alteration proposed.


EMERYVILLE, CA

The Promenade, San Pablo & Park, (DIAP)
Project designer / architect for a single-story, 2-bulding retail center. With Dan Ionescu, AIA.


FREMONT, CA

SPCRR Train Storage Facility, Ardenwood Historic Farm
RFQ submittal for site adaptation of a 50' x 125' steel framed historical train storage building. Commission awarded August 2003
Math/Science Nucleus & Children's NHM
Conceptual designs for facility in the old Fremont Library and for a freestanding museum in Central Park.

3825 Washington
Rehabilitation of historical dwelling to a real estate office use. New parking and addition at rear.


HAWAII

Pearl Harbor Federal Credit Union, Waipio, City & County of Honolulu
Production / Project Architect for a 3-story, 23,000 SF credit union. Robert G. Sarnoff, AIA designer and Architect of Record. Completed 2005 by Baker construction.
Valley Isle Community Federal Credit Union, Kahului, Maui,
New storage room added to existing facility. Design by Robert G. Sarnoff, AIA Completed 2007 by Baker Construction.
HAYWARD, CA

20551 'A' Corsair
Enlarged roll-up door opening at an existing warehouse facility.
Bay Cities Animal Hospital, 696 E. Lewelling
Signage header and 1st floor expansion. (Alameda Co. jurisdiction). Schematic design.

25375 Mission
New 4200 SF car dealership. Schematic design.


LODI, CA

Eagle Financial Credit Union
Production Architect for a new 2-story credit union. Design by Robert G. Sarnoff, AIA. Completed 2009 by Baker Construction.

NEVADA

Financial Horizons Credit Union, Yerington
Production architect for a new 1-story credit union. Design by Robert G. Sarnoff, AIA. Completed 2008 by Baker Construction.
OAKLAND, CA

Kaiperm Oakland Federal Credit Union
Production architect team member for a major remodeling and mezzanine addition to a 1970's, Pereira bank building. For Robert G. Sarnoff, AIA designer and Architect of Record.Completed 2005 by Baker Construction.

PACIFICA, CA

Gorilla BBQ, Highway 1
Conceptual design for a new restaurant with ground floor parking, and utilization of an existing rail boxcar. Paper project.
Pacific Athletic Center, 640 Crespi
Use permit and T.I. for fitness club.

Lucy's Ice Cream Store, 640 Crespi
T.I. for 800 SF ice cream store. Subject to county health department approval. Completed in 2007.

Baby Face Boxing Studio, 640 Crespi
New 3000 SF T.I. project at existing Central Food Mart.

Kenny's Chinese Restaurant, 640 Crespi
Dining room expansion to an existing restaurant. Completed in 2007.
Log Shop Annex (Phase 2) 640 Crespi
Additional retail space for surfing goods. store

Log Shop Annex (Phase 1) 640 Crespi
T.I. for a surf shop with loft.

PALO ALTO, CA

Taxim Istanbul Street Food Restaurant, 423 University
New storefront for Category 3 historical building subject to HRB and planning approval.

PHILIPPINES

Nature's Rainforest Grill, Manila
Conceptual design for a prototype restaurant and bar.
Sports / Dance Bar Prototype, Manila
Conceptual design.
REDWOOD CITY, CA

741 Barron
New fire-rated wall between 2 existing single-story warehouses.
Cash 4 Gold, 1036 El Camino Real
Conditional use permit and T.I.
SACRAMENTO, CA

Choice Auto Sales, 2241 Fulton
New 3300 SF auto sales building.

SAN BRUNO, CA

West Coast Café, (Phase 3) 446 San Mateo
New roof over existing deck per previous phase 2 expansion.
841 San Bruno Ave., Suite #1
Renovation of a fire-damaged, single-story office building wing. T.I. and exterior improvements.

Abacus 561 San Mateo Ave.
Schematic design for a restaurant and bar in an existing 2-story, 8000 SF building.

Costa's Just Things, 575 San Mateo Ave.
Facade redesign using city redevelopment funds.

Straw Hat Pizza,495 San Mateo Ave.
Pizza establishment in an existing 1-storey 2600 SF retail building. Obtained use permit and parking exception. Subject to arch. review process. Completed in 2007.
West Coast Café, (Phase 2) 466 San Mateo Ave.
Walk-in-cooler and storage annex to existing restaurant.

West Coast Cafe, (Phase 1) 466 San Mateo Ave.
Existing, gutted 1-story structure with attic to undergo interior renovations and receive a new entry facade. Subject to city's architectural design review process. Completed 2005.

Jack-in-the-Box (JIB #404)
1700 El Camino Real Internal remodeling and handicap upgrades.

SAN CARLOS, CA

Super Suppers, 189 El Camino Real
T.I. for new store.

SAN FRANCISCO, CA

American Gymnastics, 390 Bayshore
Assisted owner with outstanding permit / design issues. Original design and production by others.
92 Charter Oak
New handicap bathroom for an existing warehouse facility.

American West Parking, Inc., 224 Townsend
Conditional Use permit process for a valet public parking garage in an existing historical building. Obtained 5-year approval with renewal potential. Worked with Gladstone & Associates, real estate / development attorneys.

Bay World Trading Ltd., Pier 9
Assisted tenant with redesign of entry facade and obtaining Port planning and building approval.

Cash For Gold
3007 Mission Permitting of new wall separating public and back-of-house areas. Completed 2012
3200 Buchannan
de Arti Hair Salon.

Undisclosed Address
ADA bathroom and core upgrades for corporate users.

1323 Columbus
Coffee shop T.I in Queen Anne Style, 3-story.

SAN JOSE, CA

Stencil Masters, Inc. (SMI) 345 E. Brokaw
Code compliance case for unpermitted industrial equipment.

SAN MATEO, CA

Select Publishing Group, 1300 S. Amphlett
New 4000 shipping and receiving warehouse addition to an existing office building.
Russian School of Mathematics (RSM), 39 4rd Ave.
T.I. for 2300 SF tutorial school.

2314 Palm
Conceptual design options for new 2-story office building on a 5000 SF lot.


SAN RAFAEL CA

Jack-in-the-Box (JIB #461) 1814 2nd St.
Dining room addition subject to Design Review approval process.

SANTA ROSA, CA

North Bay Oral Surgery Office, 2211 4th St.
Exterior renovation of existing 1-story medical office building.

SEBASTOPOL, CA

1736 Burnside
New, 2-story, 3500 SF, agricultural barn and a 3.65 acre fig farm.

SOUTH SAN FRANCISCO, CA

Fairway Bar, 900 El Camino Real
Various upgrade items to an existing mixed-use building.
400 Oyster Point
8000 SF child care facility for Rainbow Bright. Conceptual design

Jack-in-the-Box (JIB #448), 201 S. Spruce
ADA Bathroom upgrades. DRB approval.


UNION CITY, CA

Chaplins Sports Bistro, 29200 Kouhoutek
T.I. for a new 4200 SF restaurant and bar. A-3 occupancy. Completed 2012.